Water Treatment Plant, Sandviken, Sweden

Dewatered Sludge Silo 100 m3 with discharge equipment.

PLANT REPORT SAX 453

Download as pdf

 

Saxwerk delivered in 2012 a new dewatered sludge silo for the water treatment plant, Hedåsen in Sandviken, Sweden.

Saxwerk has delivered, installed and commissioning a sludge silo consisting of a steel silo, sliding frame, discharge screw and a shut off damper. The equipment unload sludge to a lorry under the silo.

Technical data:
Material: Dewatered sludge
Capacity: 80 m3/h
Diameter: 4000 mm
Casing Height: 8 000 mm
Support Height: 5 500 mm
Volume: 100 m3