Fuel bunker and transport line for a 6 MW Bio gas plant
Cortus Energy AB, Höganäs Sweden
PLANT REPORT SAX 1027
Saxwerk delivered in 2018 a fuel bunker to Cortus Energy at their new Bio gas plant in Höganäs, Sweden.
Saxwerk has delivered, installed and commissioning the fuel bunker consisting of a push floor, levelling screw, discharge screw, bucket elevator, transfer screw that feeds fuel into Bio gas plant.

| Technical data: | |
|---|---|
| Material: | Wood chips, bark, sawdust |
| Capacity: | 15 m3/h |
| Length: | 6450 mm |
| Widht: | 3000 mm |
| Height: | 4000 mm |
| Volume: | 75 m3 |